ADR 066: Every change integrates on next, and only main releases

This page is generated from docs/decisions/*.yaml by task docs:export-adr-markdown. Do not edit manually.

  • Number: 066
  • Title: Every change integrates on next, and only main releases
  • Category: development
  • Status: accepted
  • Provenance: guided-ai
  • Source: docs/decisions/066-major-releases-integrate-on-a-next-branch.yaml

Decision

Work accumulates on a permanent branch named next, and a release is cut by fast-forwarding main onto it. Every change targets next, whatever version it would cut, dependency updates included. Only dependabot/* and hotfix/* may open a pull request into main, and only carrying no breaking change; the release-flow job refuses the rest and says so. Dependabot opens security updates against the default branch whatever its configuration says: retarget one to next, or, when it should ship before the next bundle, merge it into main as a fix(deps): commit -- chore(deps) cuts no release -- and rebase next afterwards. Nothing on next releases. The release workflow triggers on a push to main only, so next collects conventional commits, feat! and BREAKING CHANGE: among them, without cutting a tag. That is the whole mechanism: ADR-033 releases from every conventional commit on main, so ten fixes landing there are ten releases and a breaking change would ship the moment it merged. Bundling is not only for majors -- most bundles are minors, and a branch that releases nothing is what makes any of them possible. A release is cut by rebasing next onto main and pushing next:main. It is a push and never a pull request: main allows only rebase-merge, which replays every commit with a new sha while next keeps the originals, leaving two copies of one history. Two consequences belong to the decision rather than to the accident of it. The push is made by an administrator bypassing main's protection, because that protection gates pull requests and this is not one, so task release:promote:check asks for the CI Complete conclusion the push would otherwise skip. And rebasing next rewrites a branch other work sits on, which ADR-025 otherwise reserves for pull request branches: open pull requests into next are rebased after a promotion. Whether a change is breaking no longer decides its branch, but it decides the version the bundle cuts, so it has to be marked. A change that alters an exit code, an error kind, a flag's meaning or the shape of parsed output, or that rejects an invocation which used to succeed, is breaking even when it is a bug fix. Two things are not. Restoring behaviour an accepted ADR or a shipped release note already specified is a fix: the promise was made at that release and the binary did not keep it. And closing a security hole may ship in a minor even though it refuses something that used to be accepted, with release notes saying plainly what stopped working -- ADR-084 removes the unsafe form immediately for the same reason, and holding hardening for the next major leaves the hole open for months. next is gated exactly like main: the same branch protection, the same required CI Complete, and the full suite including the live tests. CI triggers on pull_request and push for both branches and nothing else, so a pull request into any other branch reports no checks at all.

Agent Instructions

Target next for every change, a Dependabot pull request included: retarget one opened against main rather than merging it there, unless it is a security update that should ship now, which goes in as fix(deps): with next rebased afterwards. Mark a change breaking when it would fail a command line that works today. This is enforced rather than trusted: the release-flow job refuses a pull request into main from anything but dependabot/* or hotfix/*, and refuses any of those carrying a breaking commit. It reads the same classification the release workflow does, so the gate and the version it protects cannot disagree about what breaking means. Do not open a pull request whose base is another feature branch. CI triggers only on main and next, so a stacked pull request runs nothing and merges having proven nothing. Do not add a release trigger to next, and do not tag from it. The absence of one is what makes batching possible. When adding a branch to the CI workflow triggers, add it to both the pull_request and push lists. Adding only one leaves either pull requests or the merged result unverified.

Rationale

Two facts about this project make the batching necessary rather than stylistic. ADR-033 cuts a release from every conventional commit on main, and ADR-030 keeps history linear. Together they mean a change has nowhere to wait: merging it releases it. Spending a major on each breaking change would be worse for adopters than spending one on all of them, and it would make the migration notes a series of fragments rather than a document somebody reads once. The branch releasing nothing looks like an omission, which is why it is stated: next will collect feat! commits for weeks and tag nothing, and somebody tidying the workflows should know that is deliberate before they fix it. Gating next identically to main is the part most easily skipped, and it was skipped here before this record existed: the workflow triggered on main only, so two pull requests carrying a restructured CI pipeline ran no checks at all and were nearly merged unverified. An ungated branch is worse than an obviously unbuilt one, because the pull request looks finished.

Rejected Alternatives

  • Release each breaking change as its own major: Honest under semver and unusable in practice. Adopters would cross several majors in a few months, each with its own migration note, and package managers would carry a version history in which the number stops meaning anything.
  • Keep the work on main behind flags or compatibility shims: Moves the batching problem into the code, where it is permanent. A shim outlives the migration it was written for, and the CLI would carry both behaviours indefinitely.
  • Let next release prereleases so the work can be tried early: The Sigstore certificate identity is pinned client-side to the release workflow on the main branch reference, and that pin is compiled into every shipped binary. A release cut from another branch would carry a different identity and fail verification for anyone who already has bb installed. The live suite at full command reach is the gate instead.
  • Give next a lighter CI configuration to keep iteration fast: The branch accumulates every breaking change in the release. A reduced gate there defers the cost to the merge into main, where the whole batch fails at once and the failure is hardest to attribute.